None

Recent failures

Failed In Fixed In Time Taken To Fix
#193 Code changes detected

#194 Manual run from the stage: Deploy to production by Ian Bacher

1 build

11 hours, 47 minutes

#181 Code changes detected

#182 Code changes detected

1 build

2 hours, 20 minutes

  • Average time to fix a failure: 7 hours, 4 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 11 hours, 47 minutes, from failure starting in build #193.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #181.