None
Recent failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #216 |
Code changes detected
|
Currently failing | ||
| #200 |
Changes by Ian Bacher
|
#202 |
Changes by Darius Jazayeri
|
2 builds 17 minutes |
| #193 |
Changes by Ian Bacher
|
#194 |
Manual run from the stage: Deploy to production by Ian Bacher
|
1 build 11 hours, 47 minutes |
- Average time to fix a failure: 1 week, 3 days, 7 hours, 43 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 4 weeks, 2 days, 11 hours, 4 minutes, from failure starting in build #216.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #200.