Plan for the Allergy UI module. More details of the release in https://wiki.openmrs.org/x/i4DTAw

Build: #207 was successful Manual run from the stage: Release by Wyclif Luyima

Stages & jobs

  1. Default Stage

  2. Release

    Requires a user to start manually

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
33 minutes
Labels
None
Revisions
Git
f8f29362b847d2df72288199e6a40fb4f2d80540
Release scripts
fd5310f196074c1101fc7f1e2349005e2f083d72
Total tests
1
First to pass since
#206 (Manual run from the stage: Release by Wyclif Luyima)

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

Git
Author Commit Message Commit date
Wyclif Luyima Wyclif Luyima f8f29362b847d2df72288199e6a40fb4f2d80540 Changed the module version to 1.1.2-SNAPSHOT to prepare for the release of 1.1.2 since the maven release plan for 1.1.1 failed but the tag had been created in github

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.