Build plan for Cohort module including release to BinTray
Build: #69 failed Manual run from the stage: Release by Daniel Kayiwa
Build result summary
Details
- Completed
- Queue duration
- < 1 second
- Duration
- 40300 minutes
- Labels
- None
- Revisions
-
- Git
-
51f55ccff090b89c596407865ccb8deaf3ce42f1
51f55ccff090b89c596407865ccb8deaf3ce42f1 - Release scripts
-
c4475a9228b197817dce78683d9da8a1e2c4e3a5
c4475a9228b197817dce78683d9da8a1e2c4e3a5
- Total tests
- 99
- Fixed in
- #70 (Manual run from the stage: Release by Daniel Kayiwa)
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
- 2 Quarantined / skipped
Responsible
No one has taken responsibility for this failure
Code commits
Author | Commit | Commit date | |
---|---|---|---|
dkayiwa <kayiwadaniel@gmail.com> |
51f55ccff090b89c596407865ccb8deaf3ce42f1
|
||
dkayiwa <kayiwadaniel@gmail.com> |
192deb81059739b40fc6facb87c95ea0b9fab9ed
|
Error summary for Release To Maven
The job generated some errors, drill down into the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.