Build: #789 was successful Changes by Zhuan Qingshan <zhuanqingshan@163.com>
Build result summary
Details
- Completed
- Queue duration
- 2 seconds
- Duration
- 9 minutes
- Labels
- None
- Revisions
-
- Git
-
ef463391fa944aac68f47b88e89486a3a8a5d1dc
ef463391fa944aac68f47b88e89486a3a8a5d1dc - Distribution
-
6a37a1a1b5db01216f109f6a636cb356530c2327
6a37a1a1b5db01216f109f6a636cb356530c2327 - ebola-kerrytown distro
-
d8432c6bc0b5fd23cea37ef4702a1d094f64b440
d8432c6bc0b5fd23cea37ef4702a1d094f64b440
- Total tests
- 76
- Successful since
- #772 ()
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
- 2 Quarantined / skipped
Code commits
Author | Commit | Commit date | |
---|---|---|---|
Zhuan Qingshan <zhuanqingshan@163.com> |
d331265ca00b6c7653f86d81dcbe37af982264b9
|
||
Zhuan Qingshan <zhuanqingshan@163.com> |
ef463391fa944aac68f47b88e89486a3a8a5d1dc
|
Configuration changes
Some of the jobs or stages referenced by this result no longer exist.
Jira issues
Issue | Description | Status | |
---|---|---|---|
Unknown Issue Type | ER-161 | Could not obtain issue details from Jira |