None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#9 Manual run from the stage: Release by Dimitri R

#12 Manual run from the stage: Release by Dimitri R Commented

3 builds

56 minutes

#6 Manual run by Dimitri R

#7 Changes by mks-d <dimitri@mekomsolutions.com>

1 build

26 minutes

  • Average time to fix a failure: 41 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 56 minutes, from failure starting in build #9.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #9.