None

Recent failures

Failed In Fixed In Time Taken To Fix
#102 Code changes detected

#103 Code changes detected

1 build

9 minutes

#94 Code changes detected

#98 Code changes detected

4 builds

6 days, 12 hours, 42 minutes

  • Average time to fix a failure: 3 days, 6 hours, 26 minutes
  • Average number of builds between fixes: 2.5 builds
  • The longest time taken to fix a failure is 6 days, 12 hours, 42 minutes, from failure starting in build #94.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #94.