None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#4 Manual run from the stage: Deploy to production by Cintia Del Rio

#6 Manual run from the stage: Deploy to production by Cintia Del Rio

2 builds

7 minutes

  • Average time to fix a failure: 7 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 7 minutes, from failure starting in build #4.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #4.