None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#1291 Manual run from the stage: Release by Sunny Aggarwal.

#1292 Manual run from the stage: Release by Sunny Aggarwal.

1 build

8 hours, 21 minutes

  • Average time to fix a failure: 8 hours, 21 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 8 hours, 21 minutes, from failure starting in build #1291.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #1291.