None

Recent failures

Failed In Fixed In Time Taken To Fix
#126 Manual run by Daniel Kayiwa

#127 Manual run from the stage: Release by Daniel Kayiwa

1 build

1 hour, 4 minutes

#115 Code changes detected

#116 Manual run from the stage: Release by Daniel Kayiwa

1 build

7 minutes

  • Average time to fix a failure: 36 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 1 hour, 4 minutes, from failure starting in build #126.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #115.