None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#28 |
Code changes detected
|
#31 |
Code changes detected
|
3 builds 1 week, 1 day, 2 hours, 32 minutes |
- Average time to fix a failure: 1 week, 1 day, 2 hours, 32 minutes
- Average number of builds between fixes: 3 builds
- The longest time taken to fix a failure is 1 week, 1 day, 2 hours, 32 minutes, from failure starting in build #28.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #28.