None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#2 Manual run from the stage: Release by Mike Seaton

#4 Manual run from the stage: Release by Mike Seaton

2 builds

32 minutes

  • Average time to fix a failure: 32 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 32 minutes, from failure starting in build #2.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #2.