More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #922 was successful
Job: Test against 2.0 was successful
Is before should return true if the passed date is before the date range: Test case result
The below summarizes the result of the test "Is before should return true if the passed date is before the date range" in build 922 of Reporting Module - Reporting Module - Test against 2.0.
- Description
- Is before should return true if the passed date is before the date range
- Test class
- org.openmrs.module.reporting.common.DateRangeTest
- Method
- isBefore_shouldReturnTrueIfThePassedDateIsBeforeTheDateRange
- Duration
- < 1 sec
- Status
- Successful