More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #922 was successful
Job: Test against 2.0 was successful
Is before should return false if the passed date is not before the passed date range: Test case result
The below summarizes the result of the test "Is before should return false if the passed date is not before the passed date range" in build 922 of Reporting Module - Reporting Module - Test against 2.0.
- Description
- Is before should return false if the passed date is not before the passed date range
- Test class
- org.openmrs.module.reporting.common.DateRangeTest
- Method
- isBefore_shouldReturnFalseIfThePassedDateIsNotBeforeThePassedDateRange
- Duration
- < 1 sec
- Status
- Successful