More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #921 was successful
Job: Test against 2.1 was successful
Should include visit if active visit range start before visit and range end after visit: Test case result
The below summarizes the result of the test "Should include visit if active visit range start before visit and range end after visit" in build 921 of Reporting Module - Reporting Module - Test against 2.1.
- Description
- Should include visit if active visit range start before visit and range end after visit
- Test class
- org.openmrs.module.reporting.cohort.definition.evaluator.VisitCohortDefinitionEvaluatorTest
- Method
- shouldIncludeVisit_ifActiveVisitRangeStartBeforeVisitAndRangeEndAfterVisit
- Duration
- < 1 sec
- Status
- Successful