None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#82 |
Code changes detected
|
#87 |
Manual run by Ian Bacher
|
5 builds 7 weeks, 55 minutes |
#80 |
Code changes detected
|
#81 |
Manual run by Rafal Korytkowski
|
1 build 3 weeks, 5 days, 20 hours, 46 minutes |
#75 |
Code changes detected
|
#76 |
Code changes detected
|
1 build 16 minutes |
#69 |
Code changes detected
|
#71 |
Manual run from the stage: Release by Ian Bacher
|
2 builds 1 day, 1 hour, 18 minutes |
- Average time to fix a failure: 2 weeks, 5 days, 5 hours, 49 minutes
- Average number of builds between fixes: 2.25 builds
- The longest time taken to fix a failure is 7 weeks, 55 minutes, from failure starting in build #82.
- The greatest number of builds taken to fix a failure is 5, from failure starting in build #82.