None

Recent failures

Failed In Fixed In Time Taken To Fix
#82 Code changes detected

Currently failing
#80 Code changes detected

#81 Manual run by Rafal Korytkowski

1 build

3 weeks, 5 days, 20 hours, 46 minutes

#75 Code changes detected

#76 Code changes detected

1 build

16 minutes

#69 Code changes detected

#71 Manual run from the stage: Release by Ian Bacher

2 builds

1 day, 1 hour, 18 minutes

#66 Code changes detected

#67 Manual run from the stage: Release by Daniel Kayiwa

1 build

11 hours, 59 minutes

  • Average time to fix a failure: 1 week, 2 days, 17 hours, 40 minutes
  • Average number of builds between fixes: 1.6 builds
  • The longest time taken to fix a failure is 3 weeks, 5 days, 20 hours, 46 minutes, from failure starting in build #80.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #82.