OpenMRS Core Master
Build: #3074 failed
Job: Build failed
Get effective stop date should return date stopped if date stopped is not null: Test case result
The below summarizes the result of the test "Get effective stop date should return date stopped if date stopped is not null" in build 3,074 of OpenMRS Core - OpenMRS Core Master - Build.
- Description
- Get effective stop date should return date stopped if date stopped is not null
- Test class
- org.openmrs.OrderTest
- Method
- getEffectiveStopDate_shouldReturnDateStoppedIfDateStoppedIsNotNull
- Duration
- < 1 sec
- Status
- Successful