OpenMRS Core Master
Build: #3091 was successful
Job: Build was successful
Is started should return false if the order was scheduled to start after the check date: Test case result
The below summarizes the result of the test "Is started should return false if the order was scheduled to start after the check date" in build 3,091 of OpenMRS Core - OpenMRS Core Master - Build.
- Description
- Is started should return false if the order was scheduled to start after the check date
- Test class
- org.openmrs.OrderTest
- Method
- isStarted_shouldReturnFalseIfTheOrderWasScheduledToStartAfterTheCheckDate
- Duration
- < 1 sec
- Status
- Successful