OpenMRS Core Master
Build: #3092 failed
Job: Build was successful
Get effective stop date should return date stopped if date stopped is not null: Test case result
The below summarizes the result of the test "Get effective stop date should return date stopped if date stopped is not null" in build 3,092 of OpenMRS Core - OpenMRS Core Master - Build.
- Description
- Get effective stop date should return date stopped if date stopped is not null
- Test class
- org.openmrs.OrderTest
- Method
- getEffectiveStopDate_shouldReturnDateStoppedIfDateStoppedIsNotNull
- Duration
- < 1 sec
- Status
- Successful