None

Recent failures

Failed In Fixed In Time Taken To Fix
#58 Code changes detected

Currently failing
#48 Code changes detected

#49 Code changes detected

1 build

18 minutes

  • Average time to fix a failure: 2 weeks, 7 hours, 58 minutes
  • Average number of builds between fixes: 0.5 builds
  • The longest time taken to fix a failure is 4 weeks, 15 hours, 37 minutes, from failure starting in build #58.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #48.