None

Recent failures

Failed In Fixed In Time Taken To Fix
#82 Code changes detected

#84 Manual run from the stage: Release by Daniel Kayiwa

2 builds

1 hour, 57 minutes

  • Average time to fix a failure: 1 hour, 57 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 1 hour, 57 minutes, from failure starting in build #82.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #82.