None

Recent failures

Failed In Fixed In Time Taken To Fix
#82 Code changes detected

#83 Manual run by Daniel Kayiwa

1 build

1 hour, 20 minutes

#73 Code changes detected

#74 Code changes detected

1 build

18 minutes

  • Average time to fix a failure: 49 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 1 hour, 20 minutes, from failure starting in build #82.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #73.