None

Recent failures

Failed In Fixed In Time Taken To Fix
#531 Code changes detected

Currently failing
#523 Manual run by Daniel Kayiwa

#524 Code changes detected

1 build

1 day, 6 hours, 4 minutes

#517 Code changes detected

#518 Manual run by Cintia Del Rio

1 build

9 hours, 3 minutes

#510 Code changes detected

#511 Manual run by Daniel Kayiwa

1 build

27 minutes

#506 Code changes detected

#507 Manual run by Wyclif Luyima

1 build

10 minutes

  • Average time to fix a failure: 48 weeks, 6 days, 12 hours, 38 seconds
  • Average number of builds between fixes: 0.8 builds
  • The longest time taken to fix a failure is 4 years, 36 weeks, 2 days, 20 hours, 17 minutes, from failure starting in build #531.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #506.