None

Recent failures

Failed In Fixed In Time Taken To Fix
#84 Code changes detected

#85 Manual run by Ian Bacher

1 build

1 day, 7 hours, 24 minutes

#66 Code changes detected

#67 Manual run from the stage: Release by Daniel Kayiwa

1 build

12 hours, 1 minute

#45 Code changes detected

#46 Code changes detected

1 build

1 hour, 10 minutes

  • Average time to fix a failure: 14 hours, 52 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 1 day, 7 hours, 24 minutes, from failure starting in build #84.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #45.