None

Recent failures

Failed In Fixed In Time Taken To Fix
#401 Code changes detected

#404 Manual run from the stage: Release by Mark Goodrich

3 builds

23 hours, 12 minutes

  • Average time to fix a failure: 23 hours, 12 minutes
  • Average number of builds between fixes: 3 builds
  • The longest time taken to fix a failure is 23 hours, 12 minutes, from failure starting in build #401.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #401.