None

Recent failures

Failed In Fixed In Time Taken To Fix
#82 Code changes detected

#87 Manual run by Ian Bacher

5 builds

7 weeks, 55 minutes

#80 Code changes detected

#81 Manual run by Rafal Korytkowski

1 build

3 weeks, 5 days, 20 hours, 46 minutes

#75 Code changes detected

#76 Code changes detected

1 build

16 minutes

#69 Code changes detected

#71 Manual run from the stage: Release by Ian Bacher

2 builds

1 day, 1 hour, 18 minutes

  • Average time to fix a failure: 2 weeks, 5 days, 5 hours, 49 minutes
  • Average number of builds between fixes: 2.25 builds
  • The longest time taken to fix a failure is 7 weeks, 55 minutes, from failure starting in build #82.
  • The greatest number of builds taken to fix a failure is 5, from failure starting in build #82.