None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#200 Changes by Ian Bacher

#202 Changes by Darius Jazayeri

2 builds

15 minutes

#193 Changes by Ian Bacher

#194 Manual run from the stage: Deploy to production by Ian Bacher

1 build

11 hours, 47 minutes

  • Average time to fix a failure: 6 hours, 1 minute
  • Average number of builds between fixes: 1.5 builds
  • The longest time taken to fix a failure is 11 hours, 47 minutes, from failure starting in build #193.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #200.