Build: #29 failed Manual run by Rafal Korytkowski
Build result summary
Details
- Completed
- Queue duration
- 1 second
- Duration
- 1 second
- Labels
- None
- Revisions
-
- Git
-
8b46c4c2895cfd38b5f31e1741061d8c9fcb7171
- Release scripts
-
d5831e94deff58c79f07afa118e3aad928391687
- Failing since
- #10 (Rebuilt by Rafal Korytkowski – )
- Fixed in
- #54 (Manual run by Rafal Korytkowski)
Responsible
This build has been failing since #10
No one has taken responsibility
Configuration changes
Plan configuration has changed since the last successful build. See the plan audit log for more details.
Error summary for Build and Test JDK 8
The job generated some errors, drill down into the full build log for more details.
Failed to prepare the build 'Attachments - Attachments Module - Build and Test JDK 8 #29 (ATT-ATTACH-BTJ8-29)'