Release plan for billing
None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#16 |
Code changes detected
|
#17 |
Code changes detected
|
1 build 1 day, 3 hours, 48 minutes |
#1 |
Manual run by alaboso
|
#2 |
Code changes detected
|
1 build 22 hours, 58 minutes |
- Average time to fix a failure: 1 day, 1 hour, 23 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 1 day, 3 hours, 48 minutes, from failure starting in build #16.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #1.