None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#21 |
Manual run by Nirupa Ravilla
|
Currently failing | ||
#2 |
Manual run by Nirupa Ravilla
|
#19 |
Code changes detected
|
17 builds 1 week, 6 days, 16 hours, 9 seconds |
- Average time to fix a failure: 9 weeks, 4 days, 10 hours, 19 minutes
- Average number of builds between fixes: 13 builds
- The longest time taken to fix a failure is 17 weeks, 2 days, 4 hours, 39 minutes, from failure starting in build #21.
- The greatest number of builds taken to fix a failure is 17, from failure starting in build #2.