Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#21 |
Manual run by Nirupa Ravilla
|
Currently failing | ||
#16 |
Manual run from the stage: Release by Nirupa Ravilla
|
#18 |
Manual run from the stage: Release by Nirupa Ravilla
|
2 builds 4 minutes |
#10 |
Manual run from the stage: Release by Nirupa Ravilla
|
#12 |
Manual run from the stage: Release by Nirupa Ravilla
|
2 builds 39 minutes |
- Average time to fix a failure: 5 weeks, 4 days, 19 hours, 51 minutes
- Average number of builds between fixes: 4.33 builds
- The longest time taken to fix a failure is 17 weeks, 10 hours, 51 minutes, from failure starting in build #21.
- The greatest number of builds taken to fix a failure is 9, from failure starting in build #21.