Build: #34 failed Manual run from the stage: Release by Mike Seaton
Build result summary
Details
- Completed
- Duration
- 10 minutes
- Labels
- None
- Revisions
-
- Git
-
03d4d5ba3a6a2d3f8950e3adf54db485672f4850
03d4d5ba3a6a2d3f8950e3adf54db485672f4850 - Release scripts - master
-
a9c6b4741f415820e397e9b150cf80baca7f9368
a9c6b4741f415820e397e9b150cf80baca7f9368
- Total tests
- 4
- Failing since
- #32 (Manual run from the stage: Release by Mike Seaton – )
- Fixed in
- #37 (Manual run by Mike Seaton)
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
Responsible
This build has been failing since #32
No one has taken responsibility
Configuration changes
Plan configuration has changed since the last successful build. See the plan audit log for more details.
Error summary for Release to mvn
The job generated some errors, drill down into the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.