Recent plan failures
| Failed In |
Fixed In |
Time Taken To Fix |
|
#3962
|
Scheduled
|
Currently failing
|
|
|
#3958
|
Scheduled
|
#3959
|
Scheduled
|
1 build 1 day
|
- Average time to fix a failure:
16 hours, 48 minutes
- Average number of builds between fixes: 0.5 builds
- The longest time taken to fix a failure is
1 day, from failure starting in
build
#3958.
- The greatest number of builds taken to fix a failure is
1,
from failure starting in build
#3958.
Edit Plan