DHIS Connector Module

Stages & jobs

  1. Default Stage

  2. Release

    Requires a user to start manually

Build result summary

Details

Completed
Queue duration
1 second
Duration
1 minute
Labels
None
Revisions
Git
adc818605ca63bee4aa01edfd05b7339131f04a9 adc818605ca63bee4aa01edfd05b7339131f04a9
Release scripts
681f3bff12454842e7e4fae01a15ce2827d75dc7 681f3bff12454842e7e4fae01a15ce2827d75dc7
Fixed in
#39 (Manual run by Sharif Magembe)
No failed test found. A possible compilation error occurred.

Responsible

No one has taken responsibility for this failure

Code commits

Git
Author Commit Message Commit date
Heshan Andrews <45477334+Gravewalker666@users.noreply.github.com> Heshan Andrews <45477334+Gravewalker666@users.noreply.github.com> adc818605ca63bee4aa01edfd05b7339131f04a9 adc818605ca63bee4aa01edfd05b7339131f04a9 DCM-19: Create six month april picker in run reports (#25)

Configuration changes

Plan configuration has changed since the last successful build. See the plan audit log for more details.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeDCM-19Could not obtain issue details from Jira