None

Recent failures

Failed In Fixed In Time Taken To Fix
#8 Code changes detected

#11 Code changes detected

3 builds

11 hours, 44 minutes

#6 Code changes detected

#7 Code changes detected

1 build

18 minutes

  • Average time to fix a failure: 6 hours, 1 minute
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 11 hours, 44 minutes, from failure starting in build #8.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #8.