None
Recent plan failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #4265 |
Scheduled
|
#4266 |
Scheduled
|
1 build 23 hours, 59 minutes |
- Average time to fix a failure: 23 hours, 59 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 23 hours, 59 minutes, from failure starting in build #4265.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #4265.