None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#390 Changes by Daniel Kayiwa

#391 Changes by Daniel Kayiwa

1 build

1 hour, 39 minutes

#383 Manual run from the stage: Release by Juliet Wamalwa

#385 Manual run from the stage: Release by Juliet Wamalwa

2 builds

1 week, 10 hours, 45 minutes

  • Average time to fix a failure: 3 days, 18 hours, 12 minutes
  • Average number of builds between fixes: 1.5 builds
  • The longest time taken to fix a failure is 1 week, 10 hours, 45 minutes, from failure starting in build #383.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #383.