None

Recent failures

Failed In Fixed In Time Taken To Fix
#512 Code changes detected

#516 Code changes detected

4 builds

1 week, 5 days, 8 hours, 7 minutes

  • Average time to fix a failure: 1 week, 5 days, 8 hours, 7 minutes
  • Average number of builds between fixes: 4 builds
  • The longest time taken to fix a failure is 1 week, 5 days, 8 hours, 7 minutes, from failure starting in build #512.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #512.