prepare release platform 2.6.0

Build: #2 was successful Code changes detected

Stages & jobs

  1. Update versions

  2. Build and push

  3. Validate

  4. Release

    Requires a user to start manually
  5. Release 2nd stage

  6. Release 3rd stage

Jira issues

This page shows the Jira issues that have been linked to this build. This includes issues specified in commit messages, labels or comments, as well as issues manually linked to this build.

Related issues (1 issue)
Type Key Summary Status Assignee Fix versions Related Builds Operations
New Feature TRUNK-6083 Build and deploy docker image for openmrs-core Closed raff Core 2.6.0 30 related builds