Build: #9 was successful

Job: Build was successful

Stages & jobs

  1. Update versions

  2. Build

  3. Push docker image

  4. Validate

  5. Release

    Requires a user to start manually
  6. Release 2nd stage

  7. Release 3rd stage

Jira issues

This page shows the Jira issues that have been linked to this build. This includes issues specified in commit messages, labels or comments, as well as issues manually linked to this build.

Related issues (0 issues)
Type Key Summary Status Assignee Fix versions Related Builds Operations
No issues