None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#4 Manual run from the stage: Release by Dimitri R

#5 Manual run from the stage: Release by Dimitri R

1 build

3 days, 20 hours, 23 minutes

  • Average time to fix a failure: 3 days, 20 hours, 23 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 3 days, 20 hours, 23 minutes, from failure starting in build #4.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #4.