More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #920 was successful
Job: Test against 1.10 was successful
Is after should return true if the passed date is after the date range: Test case result
The below summarizes the result of the test "Is after should return true if the passed date is after the date range" in build 920 of Reporting Module - Reporting Module - Test against 1.10.
- Description
- Is after should return true if the passed date is after the date range
- Test class
- org.openmrs.module.reporting.common.DateRangeTest
- Method
- isAfter_shouldReturnTrueIfThePassedDateIsAfterTheDateRange
- Duration
- < 1 sec
- Status
- Successful