More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #902 was successful
Job: Test against 1.12 was successful
Is within should return true if the passed date is within the passed date range: Test case result
The below summarizes the result of the test "Is within should return true if the passed date is within the passed date range" in build 902 of Reporting Module - Reporting Module - Test against 1.12.
- Description
- Is within should return true if the passed date is within the passed date range
- Test class
- org.openmrs.module.reporting.common.DateRangeTest
- Method
- isWithin_shouldReturnTrueIfThePassedDateIsWithinThePassedDateRange
- Duration
- < 1 sec
- Status
- Successful