None

Recent failures

Failed In Fixed In Time Taken To Fix
#600 Code changes detected

#605 Manual run by Mike Seaton

5 builds

1 week, 1 hour, 9 minutes

#597 Code changes detected

#599 Code changes detected

2 builds

2 days, 26 minutes

#583 Manual run by Mike Seaton

#587 Code changes detected

4 builds

5 days, 3 hours, 50 minutes

#580 Manual run by Mike Seaton

#582 Code changes detected

2 builds

2 hours, 55 minutes

  • Average time to fix a failure: 3 days, 14 hours, 5 minutes
  • Average number of builds between fixes: 3.25 builds
  • The longest time taken to fix a failure is 1 week, 1 hour, 9 minutes, from failure starting in build #600.
  • The greatest number of builds taken to fix a failure is 5, from failure starting in build #600.