OpenMRS Core Master

Build: #4080 failed Changes by Rafal Korytkowski

Stages & jobs

  1. Build

  2. Test

  3. Deploy

  4. Release

    Requires a user to start manually

Build result summary

Details

Completed
Queue duration
31 minutes
Duration
91 minutes
Labels
None
Revisions
openmrs-core
65d246bff572f1267b5747727520e68277792e43
Release scripts
cebe6dcb943ff033576f2d65053e5ad420701213
Fixed in
#4086 (Manual run by Rafal Korytkowski)
No failed test found. A possible compilation error occurred.

Responsible

  • Rafal Korytkowski Rafal Korytkowski Automatically assigned

Code commits

openmrs-core
Author Commit Message Commit date
Rafal Korytkowski Rafal Korytkowski 65d246bff572f1267b5747727520e68277792e43 TRUNK-6420: Make sure perf tests run
Rafal Korytkowski Rafal Korytkowski a7ca3c4025d4708a5bc5434afe783e267919045f TRUNK-6420: Run performance tests on CI

Configuration changes

Plan configuration has changed since the last successful build. See the plan audit log for more details.

Some of the jobs or stages referenced by this result no longer exist.

Restarting failed/incomplete builds only is not possible as some of the affected jobs no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeTRUNK-6420Could not obtain issue details from Jira

Error summary for Performance Test

The job generated some errors, drill down into the full build log for more details.

+ export IMAGE=openmrs/openmrs-core@sha256:98fe66f455fd7ba21b820d17d6505b9a478321a13c353ef68e8c580d03bdee7c
+ IMAGE=openmrs/openmrs-core@sha256:98fe66f455fd7ba21b820d17d6505b9a478321a13c353ef68e8c580d03bdee7c
+ docker pull openmrs/openmrs-core@sha256:98fe66f455fd7ba21b820d17d6505b9a478321a13c353ef68e8c580d03bdee7c
+ docker run -v m2-repo:/root/.m2/repository --rm openmrs/openmrs-core@sha256:98fe66f455fd7ba21b820d17d6505b9a478321a13c353ef68e8c580d03bdee7c mvn test -Pskip-default-test -Pperformance-test
Dec 05, 2025 1:10:22 PM sun.util.locale.provider.LocaleProviderAdapter <clinit>
WARNING: COMPAT locale provider will be removed in a future release