OpenMRS Core Master

Build: #610 was successful Changes by Daniel Kayiwa and Jakub Kondrat <jkondrat@soldevelo.com>

Stages & jobs

  1. Build and Test

Build result summary

Details

Completed
Queue duration
4 seconds
Duration
7 minutes
Labels
None
Revisions
openmrs-core
8def95976dc91d63d116b1d87d50b9ec427474b1 8def95976dc91d63d116b1d87d50b9ec427474b1
openmrs-standalone
3a6621ab7bdfa16b1fd679e5aace21fb8d6dd698 3a6621ab7bdfa16b1fd679e5aace21fb8d6dd698
Total tests
3252
Successful since
#590 ()

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

openmrs-core
Author Commit Message Commit date
Daniel Kayiwa Daniel Kayiwa 8def95976dc91d63d116b1d87d50b9ec427474b1 8def95976dc91d63d116b1d87d50b9ec427474b1 Merge pull request #1082 from jkondrat/TRUNK-2776
TRUNK-2776 Date Picker: Start of the week should be configurable
Jakub Kondrat <jkondrat@soldevelo.com> Jakub Kondrat <jkondrat@soldevelo.com> fce21e1f34ecfdb5f942b0eabfd6c49ee88f0395 fce21e1f34ecfdb5f942b0eabfd6c49ee88f0395 TRUNK-2776 Date Picker: Start of the week should be configurable

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeTRUNK-2776Could not obtain issue details from Jira