Build plan for Cohort module including release to BinTray
Build: #69 failed
Job: Release To Maven failed
Job result summary
- Completed
- Duration
- 4 minutes
- Revisions
-
- Git
-
51f55ccff090b89c596407865ccb8deaf3ce42f1
51f55ccff090b89c596407865ccb8deaf3ce42f1 - Release scripts
-
c4475a9228b197817dce78683d9da8a1e2c4e3a5
c4475a9228b197817dce78683d9da8a1e2c4e3a5
- Fixed in
- #70 (Manual run from the stage: Release by Daniel Kayiwa)
Error summary
The build generated some errors. See the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.