Build #8

More details of the release in https://wiki.openmrs.org/x/i4DTAw

Build: #8 failed Rebuilt by Dimitri R

Stages & jobs

  1. Default Stage

  2. Release

    Requires a user to start manually

Build result summary

Details

Completed
Duration
12 minutes
Labels
None
Revisions
Git
ce47ba09cf60d6dc58949fff86a687c26b0de586 ce47ba09cf60d6dc58949fff86a687c26b0de586
Release scripts
681f3bff12454842e7e4fae01a15ce2827d75dc7 681f3bff12454842e7e4fae01a15ce2827d75dc7
Total tests
488
Fixed in
#11 (Custom build by Dimitri R with revision 1.24.x)
Number of retries
1
No failed test found. A possible compilation error occurred.

Tests

Responsible

No one has taken responsibility for this failure

Code commits

Git
Author Commit Message Commit date
Ian <52504170+ibacher@users.noreply.github.com> Ian <52504170+ibacher@users.noreply.github.com> ce47ba09cf60d6dc58949fff86a687c26b0de586 ce47ba09cf60d6dc58949fff86a687c26b0de586 Update to event-api-2.8.0 (#191)
This should hopefully fix failing builds on Bamboo

Error summary for Release to maven

The job generated some errors, drill down into the full build log for more details.

[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.