More details of the release in https://wiki.openmrs.org/x/i4DTAw
Build: #8 failed
Job: Release to maven failed
Job result summary
- Completed
- Duration
- 6 minutes
Error summary
The build generated some errors. See the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.