None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#138 Manual run from the stage: Release by Daniel Kayiwa

#142 Manual run by Daniel Kayiwa

4 builds

4 days, 11 hours, 52 minutes

#136 Rebuilt by Ian Bacher

#137 Changes by dkayiwa <kayiwadaniel@gmail.com>

1 build

1 week, 4 days, 38 minutes

  • Average time to fix a failure: 1 week, 18 hours, 15 minutes
  • Average number of builds between fixes: 2.5 builds
  • The longest time taken to fix a failure is 1 week, 4 days, 38 minutes, from failure starting in build #136.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #138.