None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#138 |
Manual run from the stage: Release by Daniel Kayiwa
|
#142 |
Manual run by Daniel Kayiwa
|
4 builds 4 days, 11 hours, 52 minutes |
#136 |
Rebuilt by Ian Bacher
|
#137 |
Changes by dkayiwa <kayiwadaniel@gmail.com>
|
1 build 1 week, 4 days, 38 minutes |
- Average time to fix a failure: 1 week, 18 hours, 15 minutes
- Average number of builds between fixes: 2.5 builds
- The longest time taken to fix a failure is 1 week, 4 days, 38 minutes, from failure starting in build #136.
- The greatest number of builds taken to fix a failure is 4, from failure starting in build #138.