More details of the release in https://wiki.openmrs.org/x/i4DTAw

Build: #199 was successful Changes by Darius Jazayeri <jazayeri@alum.mit.edu>

Stages & jobs

  1. Default Stage

Build result summary

Details

Completed
Queue duration
1 second
Duration
3 minutes
Labels
None
Revision
20bd12317b7072b1d339e88327fcf57d03a0f655
Total tests
473
Successful since
#197 ()

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

Author Commit Message Commit date
Darius Jazayeri <jazayeri@alum.mit.edu> Darius Jazayeri <jazayeri@alum.mit.edu> 20bd12317b7072b1d339e88327fcf57d03a0f655 REPORT-114 - Fixed bug where we were failing to include the last millisecond of the period in the last iteration.

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeREPORT-114Could not obtain issue details from Jira